Jan282013

Jan 2013 Activity

Published by Chris Draper at 10:22 AM under Track Construction

Here is an update on the last three weeks of effort from the team while I watch from Adelaide.

13 Jan 2013

Bill Parker has got the water pump working reliably on the Hunslet
Bill (Williams) and Jim did the weed spraying on the track
Rod lubricated all the turnouts and linkages
Jim finsihed off his concret junction box mold

20 Jan 2013

George painted the inside of the signal box
Rod measured up for the new loco shed (This will be located down near the signal box for members locos)
Jim worked on the concrete junction boxes for the signalling system
Peter dug a trench through the steaming bays for a compressed air line

26 & 27 Jan 2013 

Rod, Jim, Bill and Peter put a lot of effort into finishing the steaming bays. Only one left to do

 

Whew! - at this rate the railway will be in top-notch condition when I return from Adelaide!

 