Jun062011

Bridge One Construction Photo Gallery

Published by Chris Draper at 9:43 AM under Track Construction

Bridge One was built in 2008 and is the longest bridge on the Winter Creek - but only just - at 23 metres it is 2m longer than Bridge Six. It is 3m at the highest point and took 700 hours to build.

This post is a complete photo record of its construction.

(Click on any photo to see a larger version and description. You can then navigate the gallery or start a slide show.)



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses