Jun112011

Bridge Six Construction Gallery

Published by Chris Draper at 4:50 PM under Track Construction

This gallery contains a photo record of construction of Bridge Number Six. This is the tallest on the system at 7m above the creek, and only two metres shorter than Bridge One at 21 metres long. It took 700 hours to build.

 

(click on any picture to get a larger view complete with caption.)

 



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses