Jun192011

Winter Creek Junction Construction Gallery

Published by Chris Draper at 4:10 PM under Track Construction

Winter Creek junction was built summer 2010 in the push toward finishing the mainline. It will be a focus point on the mainline as trains gather strength before tackling the heavy grade to the summit - where the Hillside branch joins the main.

 



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses