Dec092014

Saturday Working Bee

On Saturday 6th December I, Sean, spent the day at thw WCR doing more of our track maintanence program. firstly I fixed the Track Bender, then spent 2 to 3 hrs using the RTG(rolling Track Gauge) and eased the track from the tunnel to the mower crossing (approx 80 meters) making it 1-2mm wide. After this i proceded to "Fix" the slip-road points and the points to nowhere. All that needed to be done here was light grinding and making a step for the common blade. Then myself and mostly Chris , decided to put  a 5" line in the #1 road in the shed. 

 