Busy Finalising the drainage and leveling dirt down at the junction in preparation for the brick retaining wall with Jim and Noel. Here is a before/After shot taken from roughly the same place to show the extent of the work. Note the relative position of the signal box - how much the embankment has been extended to the right. First photo was taken 12 October, the Second was taken this afternoon.

 